EMBEDDED NETWORK CHANGES: Major exemption classes are closing. Public registration is mandatory. Is your Strata ready?
View in browser
Embedded Network ARENA_RGB_gradient
ENA Banner-Oct-30-2025-03-27-07-1108-AM

Big News: NSW backs IPART’s Future of Embedded Networks reforms

CALL US
VISIT OUR SITE
CASE STUDIES

Residents in embedded networks are set to benefit from the NSW Government’s formal response to IPART.

*** The changes bring stronger protections, clearer bills, and fairer pricing across electricity, gas, hot and chilled water ***

 

Below are the 4 big changes — and how Embedded Network Arena (ENA) helps you stay compliant and save.

1) Maximum prices legislated for all embedded-network utilities

  • NSW will legislate price caps for electricity, gas, hot water and chilled water within embedded networks.
  • IPART will set and enforce these caps.
  • What it means: direct safeguards for residents who can’t choose a retailer — removing excessive mark-ups and ensuring market‑comparable pricing.

How ENA helps:

  • We benchmark every site to IPART determinations and market offers.
Request a FREE Benchmark Audit

2) Transparent, energy-based billing for hot and chilled water (Item 11)

  • All hot/chilled-water bills will need to be shown in energy units (c/kWh or c/MJ) aligned to the fuel source.
  • Aligns with NECF and provides EWON access for affected customers.
  • Ends per‑litre and ā€œservice feeā€ models that aren’t linked to actual consumption.

3) Mandatory EWON membership for all EN operators

  • Every seller/operator of electricity, gas, hot or chilled water in embedded networks must join EWON.
  • Residents get the same independent complaints pathway as the open market.

4) Enforceable statutory compliance and transparency framework

  • Regulators will have powers to investigate, publish operator pricing/site info and issue penalties for non‑compliance.
  • This makes the rules enforceable — not just guidance.

How ENA helps:

  • Continuous monitoring, breach-prevention controls and remediation support.
Request a FREE Transition Strategy Call

āš ļø What worked before won’t cut it anymore.

That’s where we come in.

At Embedded Network Arena, we’ve been tracking these changes from day one — and we ensure providers stay compliant.

 

āš ļø What you should do next

  • Audit pricing and billing for your building.
  • Confirm EWON membership of your supplier.
  • Book a compliance review: we’ll map gaps against the proposed framework and IPART caps.
READ OUR OTHER MANY RESOURCES ON EMBEDDED NETWORKS
1716011-200

INDEPENDENCE GUARANTEED

 

The Embedded Network Arena are an independent consultancy firm, and we operate for the benefit of our clients. Our parent company, ARENA Energy Consulting, is a signatory to the Energy Charter’s National Customer Code and we were appointed as a founding Council Member in December 2020. Additionally, we are proud to support the Strata Community Association and the Owners Corporation Network of Australia.

We operate under a ā€˜fee-for-service’ advice model, which means that we do not receive brokerage commissions from suppliers. This ensures our independence is guaranteed.

Screenshot 2024-11-28 105455
CALL US
READ MORE
CASE STUDIES

LinkedIn
Website
5a452570546ddca7e1fcbc7d

Embedded Network Arena, LEVEL 3, 116 MILITARY ROAD, NEUTRAL BAY, NSW 2089

Unsubscribe Manage preferences